Pilots & collaboration

Bring the task.
Let’s plan the trial.

Discuss a project
A practical way to work together

From a site requirement
to an agreed pilot scope.

We plan trials with farm and beach operators, equipment teams and research partners. Start with a defined use case and an outcome you want to measure.

Farm applicationsAttachment discussionsResearch collaboration
Choose a pilot direction

Which task
are you testing?

How a pilot takes shape

A clear brief makes
a useful trial.

01 / BRIEF

Define the task

Describe the operation, site, current method and the outcome you need to evaluate.

02 / FIT

Check the setup

Review terrain, access, attachment, load and operator requirements against the platform.

03 / SCOPE

Agree the trial

Set the configuration, responsibilities, timing, commercial terms and evaluation measures.

04 / REVIEW

Learn from the field

Review the trial against the agreed task and discuss the next engineering or operating step.

Make the comparison meaningful

Bring your baseline.
Define the result.

A pilot is most useful when the current method and desired outcome are clear. Agree which measures matter before starting the work.

  • Working coverageArea or task completed under stated conditions.
  • Operator timePeople and supervision required for the operation.
  • Energy & handlingEnergy use, transport and setup needs.
  • Task qualityApplication, collection or payload outcomes relevant to the job.

Propose your pilot.

Send a short brief and the outcomes you want to measure.

Discuss a pilot